What can go wrong while a chain link fence is being built?
Most chain link jobs go to plan. When they do not, it is usually for the same handful of reasons. Knowing them in advance makes the conversation easier if one comes up.
What happens if we hit rock?
In short: we adapt the footing or move the post slightly within the line, and tell you before it changes the price.
Rock is the most common surprise in inland Málaga. A hole goes down easily for a spade's depth, then stops. Options include shaping the footing to the rock, shifting the post a little along the line, or breaking out the rock where nothing else works. Each has a different effect on time and cost, which is why we flag it straight away rather than at the end.
The measuring visit catches visible rock, but not what is under the soil. Our quotes say how unforeseen rock is handled, so it does not become a dispute.

What if there is an old fence hidden in the scrub?
In short: we remove it as part of the job, and adjust the quote if it is much more than was visible.
Brambles can hide whole sections of old wire, posts and concrete footings. When clearing the line uncovers them, they have to come out before the new fence goes in. If the old fence is far more extensive than we could see, we explain what we found and agree the change before continuing. More on this in old fence removal and replacement.
How does weather affect the build?
In short: heavy rain stops digging and concreting, and soaked ground needs time before posts can be tensioned.
Rain is the main weather risk. Saturated soil collapses into post holes, concrete should not be poured into standing water, and posts in fresh footings must not be loaded until the concrete has set. We pause rather than build badly. Tensioning comes only after the footings are ready, which is why the structure is built in stages – see posts and tensioning.
What if a neighbour disputes the line mid-job?
In short: we stop work on that section until the line is agreed – we never decide boundaries.
It happens: a neighbour sees the stakes and disagrees with where they are. We cannot settle it. Work on the disputed section pauses until you and your neighbour agree, or a surveyor marks the line. The rest of the fence can usually continue. Agreeing the boundary before work starts is the best prevention.
What if access turns out harder than expected?
In short: a blocked track or a locked gate costs time; clear arrangements beforehand avoid most of it.
A track that turns to mud after rain, a neighbour's gate that is locked, a key that does not arrive: access problems are mundane but real, especially when the owner is abroad. We agree access arrangements before the start date, and the quote reflects how far materials must be carried.

What if you change your mind during the build?
In short: changes are possible, but each one is agreed in writing with its effect on cost before we make it.
Owners sometimes decide on site to add a section on a low wall, extend the fence or change the height. That is fine. We note the change, explain what it adds, and continue once you agree. An itemised quote makes this simple, because each item can be adjusted on its own. Before ordering, our article on common mistakes when choosing chain link may save a change or two. Factors behind costs are explained on presupuestovalla.eu.
Articles and guides
Common mistakes when choosing a chain link fence
Most chain link problems are decided before the first post goes in. These are the choices that cause the most trouble later, and how to avoid them.
View details →
Old fence removal and replacement with new chain link
When an old wire fence sags, leans or has fallen in sections, patching it rarely lasts. We take it out along the line and build a new chain link fence in its place, as one job.
View details →Posts and tensioning: the structure behind a chain link fence
Chain link mesh has no strength of its own. Whether a fence stays tight or sags depends on the posts, their footings, the braces and the straining wires – the part most people never look at.
View details →Frequently asked questions
Will hitting rock increase my price?
It can. We explain the options and their effect before going ahead, so you are not surprised at the end.
Can rain damage a fence under construction?
Rain can collapse post holes and delay concreting. We pause rather than build in poor conditions.
Why not tension the mesh straight away?
The footings must be ready to take the load. Tensioning too early can pull posts out of line.
What if the old fence is bigger than expected?
We show you what we found and agree any change before continuing.
What happens in a boundary dispute?
Work on the disputed section stops until the line is agreed. We build only on an agreed boundary.
Can I change the design during the work?
Yes. Each change is agreed with its effect on cost before we make it.
What if the ayuntamiento sets new conditions?
We build to the conditions set. If they change the design, we adjust the quote accordingly.
Who is responsible if a post leans after handover?
Contact us with photos and we will look at the cause. We do not state guarantee periods on this site; ask about after-sales terms when you receive the quote.
Can work continue while I am away?
Yes, with access arranged. Ask for photo updates at each stage.
How do you avoid problems in the first place?
With a measuring visit, an agreed boundary, clear access and an itemised quote.
Send photos of your boundary
Photos and an approximate length are enough to start. We measure, then send an itemised quote with no commitment – even if you are not in Spain.